i have a question

what is the meaning of block sections 212+01+2+02+03 (arriving from Koblenz Hbf) and the same question i have for train coming from North (Weissenthurm) regarding blok section 001+41+2

I ask this because after train flashing on sections announce V33 (Kobl Hbf) or V002 (From Koln) train go promptly on section 33 (from Koblenz Hbf) and 002 (from Weissenthurm) and other sections are not interested from train arriving

Thanks for reply

Diego

Posted

Pretty sure that those are the mirror train windows of trains at Koblenz Hbf platforms 1,2,3 plus entrance tracks from Mainz

For the KWEH side similar thing. Track sections between KWEH and KAND.

Those are likely to work ONLY when in Line Operations, for the same reasons as discussed and explained by Richard in your KWEH topic.

Erwin

Pretty sure that on KKO those are the mirror train windows of trains at Koblenz Hbf platforms 1,2,3 plus entrance track from Mainz

For the KWEH side similar thing. Track sections between KWEH and KAND.

Those are likely to work ONLY when in Line Operations, for the same reasons as discussed and explained by Richard in your KWEH topic.

Erwin

Posted

Yes, these are all the mirror tracks from Koblenz Hbf. They will only work in line operations. The one that comes in the Vbox and has the last flashing number will be the first one send.

As Koblenz Hbf has MANY tracks, we can't wire them up properly while in single modus...

Posted

OK. then to have a whole representation for trains on this sections if i well comprise is necessary to have Lutzel simulation linked with the incoming simualation of Koblenz Hbf and so for existing Weissenthurm simulation. Is this correct ?

good evening

Diego

Posted

once Koblenz Hbf is out, you will see the left side of those train descriptors being filled...

Because it is a whole layout of tracks that belongs to anothe area, we did NOT do the same like in Cologne with Cologne-Deutz. (There you have an extensive view of that layout too)

We're going to make Koblenz Hbf soon. But it's quite a chunk of work. (it's in the timetable already...)

Posted

ok Richard

Thanks for your reply

Diego