intallonabile Posted May 6, 2012 Posted May 6, 2012 tomorrow i start with new timetable 2012 (very very thanks to Neopileos) and at 6:05 stellwerke propose to me to change from nacht to tag. I had changed with station button but after changing the ding ding still remain and a cant stop it ciao Diego
intallonabile Posted May 6, 2012 Author Posted May 6, 2012 Sorry !! I apologize myself I had Weissenthurm linked in lineops and the ding ding was this for weissenthurm stellwerke, KKOL was OK after changing it !! Diego
Nopileos Posted May 6, 2012 Posted May 6, 2012 Hi Diego, are you sure, that it was the day-night-ringing at Weißenthurm? I have just check it and it works well. It cant be a problem with the timetable because it is a component of the program and not of the timetable. Greets Nopileos
TjoeTjoe Posted May 6, 2012 Posted May 6, 2012 As said by Diego, in the end there was no problem at all. Diego tends to connect multiple simulations together, and by his second post he just admitted that he had been operating the wrong button on the wrong panel No further discussion needed Erwin
Recommended Posts